|
|
|
13.04.26 - 20:30
|
Arbor Metals Completes Phase 1 2026 Drilling At Jarnet Lithium Project (The Newswire)
|
|
|
Vancouver, Canada – April 13, 2026 – TheNewswire – Arbor Metals Corp. (“Arbor” or the “Company”) (TSXV: ABR, FWB: 432) is pleased to announce the completion of its Phase 1 2026 diamond drilling program at its wholly owned Jarnet Lithium Project, located in the Eeyou Istchee James Bay region of Quebec, adjacent to Patriot Battery Metals' Shaakichiuwaanaan Property (formerly the Corvette Project). A total of 5 holes totaling 1,433 meters were drilled. Samples were sent to ALS Laboratories in Sudbury, Ontario. Results are expected in the near term.
The 2026 Phase 1 drill program was designed to build on promising lithium mineralization identified during the 2025 exploration programs. Drilling efforts were concentrated on the Jarnet 2 claim block, where holes JAR26-37 to JAR26-39 targeted a prominent linear lithium anomaly identified in the 2025 Bark Sampling program. Holes JAR26-40 and JAR26-41 were drilled to build on elevated lithium values from 2025 drilling which yielded several significa...
|
|
|
09.03.26 - 13:01
|
Arbor Metals Commences Phase 1 2026 Drill Program At Jarnet Lithium Project (The Newswire)
|
|
|
Vancouver, Canada – March 9th, 2026 – TheNewswire – Arbor Metals Corp. (“Arbor” or the “Company”) (TSXV: ABR, FWB: 432) is pleased to announce the commencement of its Phase 1 2026 diamond drilling program at its wholly owned Jarnet Lithium Project, located in the Eeyou Istchee James Bay region of Quebec, adjacent to Patriot Battery Metals' Shaakichiuwaanaan Property (formerly the Corvette Project).1
The Phase 1 program is designed to follow up on encouraging lithium mineralization identified during the Company's 2025 drill programs, which returned several notable lithium-bearing pegmatite intercepts.
Highlights from the 2025 Drill Program2
JAR25-014 (Jarnet 2 – Prince Zone) intersected 1.56 metres grading 5,781 ppm Li (~0.57% Li) at 54.7 metres depth
JAR25-015 (Jarnet 2) intersected 1.5 metres grading 2,224 ppm Li (~0.22% Li) at 212.06 metres depth
On the Corvette claim blocks, holes JAR25-029, JAR25-030, and JAR25-031 intersected anomalous lithium values within a series of paralle...
|
|
|
15.01.26 - 14:01
|
Arbor Metals Intersects Anomalous Lithium Mineralization up to 0.58% Across 2 Target Zones at Jarnet Lithium Project (The Newswire)
|
|
|
Vancouver, Canada – TheNewswire - January 15th, 2026 – Arbor Metals Corp. (“Arbor” or the “Company”) (TSXV: ABR, FWB: 432) is pleased to announce assay results from its 2025 Phase 3 diamond drilling program at its wholly owned Jarnet Lithium Project, located in the Corvette Lake Lithium Camp, Eeyou-Istchee Baie-James territory in the Quebec North region. Anomalous lithium was encountered on the Jarnet 2 and Corvette claim blocks.
Several intervals of anomalous lithium was identified within pegmatite dykes.
On the Jarnet 2 claim blocks samples from JAR25-014 (at the northern extent of the Prince Zone) and JAR25-015, were oriented to test an over 200m wide series of pegmatites, both intersected anomalous lithium.
JAR25-014 intersected 1.56m grading 5781ppm (~0.57%) lithium at a depth of 54.7m.
JAR25-015 intersected 1.5m grading 2224ppm (~0.22%) lithium at a depth of 212.06m.
On the Corvette claim blocks samples from JAR25-029, JAR25-030 and JAR25-031 were oriented to test aro...
|
|
|
19.11.25 - 23:00
|
Arbor Metals Closes $1 Million Private Placement (The Newswire)
|
|
|
Vancouver, Canada – TheNewswire - November 19th, 2025 – Arbor Metals Corp. (“Arbor” or the “Company”) (TSXV: ABR, FWB: 432) is pleased to announce that it has closed a non-brokered private placement (the “Offering”) and has issued 5,000,000 units (each, a “Unit”) at a price of $0.20 per Unit for gross proceeds of $1,000,000. Each Unit consists of one common share, issued as a “flow-through share” within the meaning of the Income Tax Act (Canada) and one-half of one share purchase warrant (each whole warrant, a “Warrant”). Each Warrant is exercisable at a price of $0.25 until November 19, 2028.
The Company anticipates the proceeds of the Offering being directed towards the continued exploration and development of the Jarnet Lithium Project and the Ernest REE Project, both of which are located in the Province of Quebéc.
In consideration for introducing the investor to the Offering, the Company has issued 500,000 shares and 250,000 non-transferable share purchase warrants (ea...
|
|
|
|
|
20.03.25 - 07:00
|
Arbor Metals Completes Phase 2 Drilling At Jarnet Lithium Project (The Newswire)
|
|
|
Vancouver, Canada – March 20th, 2025 – TheNewswire - Arbor Metals Corp. (“Arbor” or the “Company”) (TSXV: ABR, FWB: 432) is pleased to announce the completion of its 2025 phase 2 diamond drilling program at its wholly owned Jarnet Lithium Project, located in the Corvette Lake Lithium Camp, Eeyou-Istchee Baie-James territory in Quebec North region.
The Phase 2 drilling campaign completed a total of 16 NQ2 holes, for a combined drilling length of 3792 meters. Four distinct target areas were investigated based on results of the 2024 drill program. Drilling depths varied from 152m to 369m in length. All holes were drilled by Fusion drilling. Approximately 1300 samples have been sent for analysis, including blanks and standards to confirm lab quality.
Granitic pegmatites were noted and sampled in all 16 holes covering all target areas. Molybdenite was noted and pegmatite related in five drill holes. Molybdenite was recorded in three separate target zones. The host rock for the pegmatites is quartz ...
|
|