|
28.08.25 - 01:03
|
NexGold Announces Management Changes (GlobeNewswire EN)
|
|
TORONTO, Aug. 27, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) announces that Jeremy Wyeth has stepped down from the position of Chief Operating Officer of the Company as a result of a restructuring of its executive management team. This organizational restructuring creates an efficient and effective flat line structure to allow for direct communication and faster decision-making as the Company accelerates towards its next exciting phase....
|
|
27.08.25 - 17:01
|
XFRA: TRC: Wiederaufnahme/Resumption (XETRA)
|
|
FOLGENDE(S) INSTRUMENT(E) WIRD/ WERDEN WIEDER IN DEN HANDEL AUFGENOMMEN MIT FOLGENDEM TRADING SCHEDULE.
THE FOLLOWING INSTRUMENT(S) IS/ARE RESUMED TRADING WITH FOLLOWING TRADING SCHEDULE:
INSTRUMENT NAME KUERZEL/SHORTCODE ISIN
NEXGOLD MINING CORP. TRC CA65345V1085
AB/FROM ONWARDS 27.08.2025 16:54 CET...
|
|
|
27.08.25 - 16:31
|
XFRA: TRC: Aussetzung/Suspension (XETRA)
|
|
DAS/ DIE FOLGENDE(N) INSTRUMENT(E) IST/ SIND AB SOFORT AUSGESETZT:
THE FOLLOWING INSTRUMENT(S) IS/ ARE SUSPENDED WITH IMMEDIATE EFFECT:
INSTRUMENT NAME KUERZEL/SHORTCODE ISIN BIS/UNTIL
NEXGOLD MINING CORP. TRC CA65345V1085 BAW/UFN...
|
|
|
20.08.25 - 13:03
|
NexGold Intersects 18.16 g/t Gold over 2.1 Metres and 6.91 g/t Gold over 2.5 Metres at the Goldboro Open Pit Gold Project (GlobeNewswire EN)
|
|
TORONTO, Aug. 20, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide final drill results from a recently-completed 26,854-metre diamond drill program initially announced on January 22, 2025 at the Company's Goldboro Open Pit Gold Project (“Goldboro”) in Nova Scotia. The drill program was primarily designed to infill specific areas of the open pit Mineral Resource identified to improve geological and grade continuity and potentially upgrade certain areas of Inferred and Indicated Mineral Resources. The assay results for the final 14 infill diamond drill holes (BR-25-585 and 593 to 603), totalling 2,072.0 metres, were from drilling in the proposed west and east pits of the Goldboro Open Pit Gold Project (Figures 1 and 2; Tables 1 and 2)....
|
|
05.08.25 - 19:15
|
Kevin Bullock, CEO of NexGold Lays Out his Master Plan for Two Near-Term Gold Projects in Canada (The Newswire)
|
|
Vancouver, BC – TheNewswire - August 5, 2025 – Global Stocks News - Sponsored content disseminated on behalf of NexGold Mining. On July 30, 2025 NexGold Mining (TSXV: NEXG) (OTCQX: NXGCF) published additional drill results from a recently completed 26,854-metre diamond drill program at the company's Goldboro Open Pit Gold Project in Nova Scotia, Canada.
“Goldboro continues to demonstrate the presence of high-grade zones, near surface, within the planned open pits,” stated Kevin Bullock, President and CEO of NexGold.
“We are encountering this style of mineralization at open pit depths with all intersected zones projecting to surface. We anticipate final assays from the full drill program to be returned in the coming weeks and are looking forward to using that information in an updated Mineral Resource estimate which will ultimately inform the planned updated Feasibility Study.”
Click Image To View Full Size
“Intersecting 40 grams per tonne gold over 17.7 Metres is not entirely typical in ...
|
|
24.07.25 - 13:03
|
NexGold Continues to Intersect High-Grade Gold Mineralization at the Goldboro Open Pit Gold Project, Including 108.76 g/t Au over 1.40 metres and 67.23 g/t gold over 2.20 metres (GlobeNewswire EN)
|
|
TORONTO, July 24, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide additional drill results from a recently-completed 26,854-metre diamond drill program initially announced on January 22, 2025 at the Company's Goldboro Open Pit Gold Project (“Goldboro”) in Nova Scotia. The drill program is primarily designed to infill specific areas of the open pit Mineral Resource identified to improve geological and grade continuity and potentially upgrade certain areas of Inferred and Indicated Mineral Resources. The assay results for an additional 11 infill diamond drill holes (BR-25-566 to 569, BR-25-571 to 573, 577, 578, 582, and 590), totalling 1,944.05 metres, were from drilling in the proposed west and east pits (Figures 1 and 2; Tables 1 and 2)....
|
|
17.07.25 - 13:03
|
NexGold Continues to Intersect High-Grade Gold Mineralization at the Goldboro Open Pit Gold Project, Including 50.73 g/t gold over 6.65 metres and 5.28 g/t gold over 19.20 metres (GlobeNewswire EN)
|
|
TORONTO, July 17, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide additional drill results from a recently-completed 26,854-metre diamond drill program initially announced on January 22, 2025 at the Company's Goldboro Open Pit Gold Project (“Goldboro”) in Nova Scotia. The drill program is primarily designed to infill specific areas of the open pit Mineral Resource identified to improve geological and grade continuity and potentially upgrade certain areas of Inferred and Indicated Mineral Resources. The assay results for an additional 14 infill diamond drill holes (BR-25-551 to 559 and BR-25-561 to 565), totalling 3,347.0 metres, were from drilling in the proposed west and east pits (Figures 1 and 2; Tables 1 and 2)....
|
|
|
08.07.25 - 13:03
|
NexGold Receives Schedule 2 Amendment Approval for Goldboro Gold Project (GlobeNewswire EN)
|
|
TORONTO, July 08, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to announce that the federal government of Canada has approved an amendment to Schedule 2 of the Metal and Diamond Mining Effluent Regulations (“MDMER”) for the Goldboro Gold Project (“Goldboro”). This amendment lists one geographic area encompassing seven water bodies located within the footprint of the Project's tailings management facility (TMF) to Schedule 2 of the Regulations, thereby designating them as tailings impoundment areas. The amendment was published in the Canada Gazette, Part II, on July 2, 2025....
|
|
|
26.06.25 - 13:03
|
NexGold Infill Drilling Continues to Intersect High Grade Gold Mineralization at the Goldboro Gold Project; 3.58 g/t Gold Over 18.3 Metres, 2.79 g/t gold over 19.7 Metres and 103.50 g/t Gold Over 0.7 Metres (GlobeNewswire EN)
|
|
TORONTO, June 26, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide a further update on its ongoing 25,000-metre diamond drill program initially announced on January 22, 2025 at the Company's Goldboro Gold Project (“Goldboro”) in Nova Scotia. The drill program is primarily designed to infill specific areas of the open pit Mineral Resource identified to improve geological and grade continuity and potentially upgrade certain areas of Inferred and Indicated Mineral Resources. The assay results for an additional 8 infill diamond drill holes (BR-25-515, 521, 523, 527, 530, 534, 539, and 544), totalling 1,687.00 metres, are from drilling in the proposed west pit (Figure 1; Table 1)....
|
|
19.06.25 - 13:03
|
NexGold Infill Drilling Intersects 1.60 g/t Gold Over 36.80 Metres at the Goldboro Gold Project (GlobeNewswire EN)
|
|
TORONTO, June 19, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide an update on its ongoing 25,000-metre diamond drill program initially announced on January 22, 2025 at the Company's Goldboro Gold Project in Nova Scotia (“Goldboro”). The drill program is primarily designed to infill specific areas of the open pit Mineral Resource identified to improve geological and grade continuity and potentially upgrade certain areas of Inferred and Indicated Mineral Resources. The drilling is progressing well with two active diamond drills. The drilling is anticipated to be completed at the end of Q2 with final assays flowing in through the middle of Q3....
|
|
18.06.25 - 13:03
|
NexGold VP Sustainability Receives Prestigious Mining Society of Nova Scotia Medal (GlobeNewswire EN)
|
|
TORONTO, June 18, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to announce that Deidre Puddister, VP Sustainability with NexGold, has been honoured with the prestigious Mining Society of Nova Scotia Medal. The Mining Society Medal is awarded in recognition of exceptional service rendered to the mining industry in the Province of Nova Scotia and is decided by a special committee. The Mining Society of Nova Scotia is an independent society affiliated with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) with a rich history dating back to the 1890s in Nova Scotia....
|
|
13.06.25 - 13:03
|
NexGold Infill Drilling Intersects 25.79 g/t Gold Over 4.5 Metres and 18.09 g/t Gold over 3.0 Metres at the Goldboro Gold Project (GlobeNewswire EN)
|
|
TORONTO, June 13, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide an update on its ongoing 25,000-metre diamond drill program initially announced on January 22, 2025 at the Company's Goldboro Project in Nova Scotia (“Goldboro”). The drill program is primarily designed to infill specific areas of the open pit Mineral Resource identified to improve geological and grade continuity and potentially upgrade certain areas of Inferred and Indicated Mineral Resources. The drilling is progressing well currently with two diamond drills and nearing the end of the drill program. The drilling is anticipated to be completed at the end of Q2 with final assays flowing in through the middle of Q3....
|
|
05.06.25 - 13:03
|
NexGold Infill Drilling Intersects 11.87 g/t Gold Over 6.1 Metres and 3.77 g/t Gold Over 9.1 Metres at the Goldboro Gold Project (GlobeNewswire EN)
|
|
TORONTO, June 05, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide an update on its ongoing 25,000-metre diamond drill program initially announced on January 22, 2025 at the Company's Goldboro Project in Nova Scotia (“Goldboro”). The drill program is primarily designed to infill specific areas of the open pit Mineral Resource identified to improve geological and grade continuity and potentially upgrade certain areas of Inferred and Indicated Mineral Resources. The drilling is progressing well with three diamond drills currently at Goldboro, which have completed approximately 22,000 metres of diamond drilling. The program is anticipated to be completed at the end of Q2....
|
|
|
16.05.25 - 14:03
|
NexGold Infill Drilling Intersects New Zones of Gold Mineralization at the Goldboro Gold Project (GlobeNewswire EN)
|
|
TORONTO, May 16, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide an update on its ongoing 25,000 metre diamond drill program initially announced on January 22, 2025 at the Company's Goldboro Project in Nova Scotia (“Goldboro”). The drill program is primarily designed to infill specific areas of the open pit Mineral Resource identified to improve geological and grade continuity and potentially upgrade certain areas of Inferred and Indicated Mineral Resources. The drilling is progressing well with three diamond drills currently at Goldboro, which have completed approximately 17,000 metres of diamond drilling. The program is anticipated to be completed at the end of Q2....
|
|
|